The construction of subway (metro) in Almaty began back in 1988 and was conducted irregularly because of the finance problems. Finally, December 1, 2011 the first line of the subway was opened.
This is the first subway in Kazakhstan, the second in Central Asia (after Tashkent subway) and sixteenth in the former Soviet Union. Hours: daily from 06:30 to 23:30. The total length of the two lines will be about 45 km.
Tags: Almaty city
SonicReducer · January 8, 2013 at 12:50 am
How much it cost? I mean the ticket.